+34 986 190 022
info@cablesestructurales.com

Blog

Structural cable system for pedestrian walkway

From our factory directly to on-site assembly!

After an arduous manufacturing process, this pedestrian bridge project in the center of Portugal has finally been completed.

Our proposal is to replace traditional “sockets” terminals that take a lot of time to manufacture and prepare.

Our cable stay systems are composed of machined terminals pressed directly on the cable, thus having the capacity to press ropes and strands up to Ø40mm.

Post a comment

Your email address will not be published. Required fields are marked *

logo main

Donde nos encontramos

Onde estamos localizados

Where we are

Où nous sommes situés